Separate PM Action/Jobs
Route PM Action/Jobs

[About PM Action] [To PM Processing]

Usage

Use this tab to enter and view information on the jobs that are connected to the preventive maintenance (PM) action. If a standard job identity is entered on the Jobs tab, all the planning information entered in the standard job is copied to this tab.

Use the lower table on the tab to view the operation lines that are connected to the jobs and to connect or disconnect the operation lines from the jobs. Note: Operation lines cannot be entered on the Route PM Action/Jobs tab. 

To remove the connection between the operation and the job, right-click on the operation line and then click Disconnect Operation

Activity Diagrams

Prepare Separate PM Action
Prepare Route PM Action

Activities

Enter Jobs
Enter Standard Jobs
Connect Operations