Separate PM Action/Maintenance Plan | Route PM Action/Maintenance Plan

[About PM Action] [About PM Plan] [To PM processing]

Usage

Use this tab to view and adjust the PM Actions with calendar-based/ condition-based generation. You can view the entire list of weeks and dates for which work orders will be generated for the PM Action. The dates are generated automatically using the criteria you set up for calendar generation in the General tab or criteria you set up  for condition generation in the Conditions tab. You can adjust the preventive maintenance plan (PM Plan) by changing the planned date. Inventory Part Demand Published check box indicates which of the planning lines are available for Inventory Part Availability Planning as demands. You can use the Generate Work Order right mouse button option to generate a selected row or multiple rows in the window.

You can also schedule and plan jobs and operations (with jobs connected to them) that are registered in the Separate PM Action/Jobs and Separate PM Action/Operations tabs, for a single occurrence in the PM plan, provided that the PM_PLAN_OPERATION system parameter is set to TRUE in IFS/Application Services and that Work orders have not been previously generated. If modifying the calendar or condition settings on a PM action, the maintenance plan will be re-generated and all allocations done on maintenance plan lines will be removed.

Activity Diagrams

Generate Work Order

Activities

Schedule and Plan Jobs and Operations per Preventive Maintenance Plan Line