Project Item Navigator/Consists Of

[About Project Product Structure] [About Part Ownership] [About Project Inventory] [To Design Project Delivery Product] [To Assemble And Test Project Delivery Product]

Usage

Use this tab window to view the first level of the structure of the specified project item. The structure can be modified by using some of the available menu options in the tab window.

If the parent is in status Realized, the new part must have been created in Project Product/Items tab and set to status Realized before it can be connected to the realized part’s structure. Status changes for the subpart can be done from the menu.

You can transfer a list of parts to Project Item window by selecting the menu option Project Item or to Engineering Part Revision window by selecting the menu option Engineering Part Revision. Other menu options available to go directly to relevant window or form are Inventory Part, Inventory Availability Planning, Purchase Part, Product Structure, Part and Best Fit Search.

Using the menu option View All Parents, you can view all parts where the current project item is a member in the structure, and transfer to new instance of the Project Item window. All parts or project items that have current part as a child part will then be available in the combo box.

Activities in this tab window can also be performed in Project Item/Consist Of tab.

Activity Diagrams

Create And Maintain Project Product Structure
Handle Project Delivery Changes
Approve Project Product Structure
Define/Redefine Serial Numbers
Analyze Test Results
Complete Project Product Structure Information
Prepare Assembly

Activities

Enter Project Item
Build Project Delivery Structure
Delete Project Delivery Structure Branch
Change Project Product
Copy Standard Structure
Copy Project Item Structure
Replace Serial
Reserve Serial Number
Unreserve Serial Number
Set Serial Number
Reset Serial Number
Approve Project Product Design
Set Project Product Structure Realized
Redefine Project Item
Redesign Project Item
Reserve Inventory to Project
Issue from Inventory to Project Delivery
Unissue to Inventory from Project
Print Pick List
Change Inventory Part Location