Adjust Split Operations

[About Shop Order]

[To Manufacturing]

Usage

Use this dialog box to re-distribute the operation quantities manually within the split operations.  It can be opened from either the original operation or a split operation. It will display the set of all the connected split operations. The distribution of operation quantities should match the total remaining quantity to report, i.e. the summation of the available quantity to update for all operations. It isn’t possible to increase the quantity of the part to be manufactured by using this dialog box as well.

Activity Diagrams

Handle Shop Order

Activities

Adjust Split Operations