Remove/Modify/Reassign Shipment Lines

Explanation

This activity is used to change the content of the shipment by either removing, modifying or reassigning the quantity of a shipment line. There are several situations where it may be necessary to remove a shipment line or adjust the quantity of a shipment line. The person responsible for the shipment may realize the need for removal, modification or addition of a line at any stage in the process, including just before loading the truck. Therefore, it is imperative that it is possible, as long as the lines are not delivered. If required, the quantity of an order line can be connected to several shipments in parallel in order to handle a limited transport capacity, a backorder situation where you want to prepare the next delivery in advance, a customer requiring a certain delivery schedule etc.

When reassigning a shipment line quantity, this is disconnected from current shipment and connected to a new shipment, an existing shipment, or the customer order. If desired you can reassign the reserved and picked quantities of the shipment line to the destination.

Prerequisites

General:

To remove shipment lines:

To modify the quantity of shipment lines:

To reassign the quantity of the shipment lines:

System Effects

General:

When shipment lines are removed:

When the quantity of shipment lines are modified:

When the quantity of the shipment lines are reassigned:

Window

Shipment
Shipment Lines
Reassign Shipment Connected Quantity
Reassign Shipment Connected Quantity for Package Parts

Related Window Descriptions

Shipment
Shipment/Shipment Lines
Shipment Lines
Reassign Shipment Connected Quantity
Reassign Shipment Connected Quantity for Package Parts

Procedure

To remove shipment lines:

  1. Click the Shipment Lines tab to view all the order lines and quantities connected to the shipment.
  2. Mark the order lines you want to remove from the shipment, and click Remove on the toolbar.
  3. Save the changes. 

To modify the quantity of shipment lines:

  1. Click the Shipment Lines tab or open the Shipment Lines window to view all the order lines and quantities connected to the shipment.
  2. Change the value in the Connected Sales Qty field as desired.
  3. Save the changes.

To reassign the quantity of non package part shipment lines:

  1. Open the Reassign Shipment Connected Quantity window. Note that this window is also available via the Reassign Connected Quantity option in the Shipment Lines window and the Shipment/Shipment Lines tab.
  2. Retrieve the shipment line for which you want to reassign any shipment connected quantity, by using the Populate or Query function.
  3. In the Destination group box, select if you want to reassign the quantity back to the customer order line, to an existing shipment or to a new shipment.
  4. If you reassign to an existing shipment, enter the shipment ID or select one from the List of Values in the Shipment ID field.
  5. In the Release Reservations check box, decide whether or not the reservations should be released at the destination.
  6. In the Quantities group box, specify the not reserved quantity you want to reassign in the Not Reserved Qty/To Reassign field. Alternatively, select the Reassign All check box to include the entire not reserved quantity.
  7. If all reserved and picked quantities should be included in the reassignment, click the Reassign All check box for the reserved quantity.
  8. If the entire shipment line quantity should be included in the reassignment, click the Reassign All check box for the total quantity.
  9. If less reserved and picked quantities should be included, this has to be specified on the Single tab and the Pallet tab. In these tabs you can either include the entire reservation by selecting the Reassign All check box or enter the desired quantity in the Qty to Reassign field.
  10. Save the changes.

To reassign the quantity of package part shipment lines:

  1. Open the Reassign Shipment Connected Quantity for Package Parts window. Note that this window is also available via the Reassign Connected Quantity option in the Shipment Lines window and the Shipment/Shipment Lines tab.
  2. Retrieve the shipment line for which you want to reassign any shipment connected quantity, by using the Populate or Query function.
  3. In the Destination group box, select if you want to reassign the quantity back to the customer order line, to an existing shipment or to a new shipment.
  4. If you reassign to an existing shipment, enter the shipment ID or select one from the List of Values in the Shipment ID field.
  5. In the Release Reservations check box, decide whether or not the reservations should be released at the destination.
  6. In the Quantities group box, specify the not reserved quantity you want to reassign in the Not Reserved Qty/To Reassign field. Alternatively, select the Reassign All check box to include the entire not reserved quantity.
  7. Specify the reserved quantity you want to reassign in the Reserved Qty/To Reassign field. Alternatively, select the Reassign All check box to include the entire reserved quantity.
  8. If the entire shipment line quantity should be included in the reassignment, click the Reassign All check box for the total quantity.
  9. In the lower part of the window, the component quantity needed to reassign complete packages must be specified. Depending on if you reassign reserved packages or not reserved packages, different kinds of component quantities must be included, based on the quantity per assembly for the component. The components are represented as one record for the quantity not reserved, and one record for each reservation. If possible, the component quantity is decided automatically when the header information is entered. Otherwise, you can either include the entire quantity by selecting the Reassign All check box, or enter the required quantity in the Qty to Reassign field to get a complete package.
  10. Save the changes.