Use this activity to specify the stress ratings for a serial structure at a given date. If no recorded date is given, the system date is used. To report operational loggings on life limited parts, the stress ratings must exist at the given measure date. Record all historical stress ratings before performing operational loggings.
Stress ratings must have been defined for the template part. For more information, refer the online help file: Activity Define Stress Ratings.
All the stress ratings entered for the serial are entered into the history. The serial's stress rating history is used to calculate the remaining life for life limited parts. Note that setting historical stress ratings will not affect the stress ratings of already reported operational loggings.
Component Life
History Per Serial
Component Life/General
Stress Rating History
History Per Serial/Stress Rating
Template Part/Stress Ratings
Stress Ratings
Serial Part Revision/Life
Limit
Life Limited Parts
Follow this procedure to specify stress ratings for a serial structure from the Component Life window.