Connect Distribution Allocation

Explanation

This activity is used to connect existing distribution allocations to a campaign. Distribution allocations allow you, to move multiple parts handled by the campaign, to multiple sites the campaign is valid for, from a particular supply site.

Prerequisites

This activity has the following prerequisites.

System Effects

Window

Campaign

Related Window Descriptions

Campaign
Campaign/Allocation Plan

Procedure

  1. Open the Campaign window, query for the required campaign and click the Allocation Plan tab.
  2. Click New to add a new distribution allocation to a campaign.
  3. Enter manually or select from the List of Values, the distribution allocation to be added in to the campaign and the corresponding planned due date, supply site and the status will be displayed.
  4. Repeat steps 2-3 until all required distribution allocation have been added.
  5. Save when completed.