Connect Control Plan, Manufacturing

Explanation

Use this activity to change the Control Plan Manufacturing associated with a shop order if the Phase In or Phase Out dates of the Control Plan do not properly coincide with the Start Date of the shop order. The Start Date must fall between the Phase In and Phase Out dates of the Control Plan. If it does not, you will not be able to create an analysis or view the details of an analysis for this shop order. Once everything is done, shop order connected control plan will be reconnected accordingly with the used Start Date.

This activity can also be used to change the Control Plan if the shop order has been modified. If operations have been added to the shop order, for example, you might want to create a new Control Plan revision that includes these operations. You can then change your shop order to use this new Control Plan revision. 

You can use this activity either before or after creating your analyses.

Prerequisites

This activity requires that a shop order be connected to a Control Plan Manufacturing in the Active state.

System Effects

As a result of this activity, a new Control Plan or Control Plan revision number is connected to a shop order.

Window

Shop Order

Related Window Descriptions

Shop Order,
Change Control Plan

Procedure

  1. Query for the shop order that requires a new Control Plan.
  2. Select the Control Plan tab.
  3. Right-click and select Connect Control Plan.
  4. Use the List of Values to select a new Control Plan number and/or revision number.
  5. Click OK when you are finished.