Activate Control Plan Template

Explanation

Use this activity to activate your control plan template revision. The control plan template must be Active to be used. A control plan template in state Active cannot be changed.

Prerequisites

A control plan template revision in state Created must exist. If a checklist exists, then all checklist items must be approved.

System Effects

As a result of this activity, the control plan template will be in Active status. If you are activating a new revision of an already existing template:

Window

Control Plan Template

Related Window Descriptions

Activate Control Plan Template Assistant

Procedure

  1. In the control plan template header, right-click and then click Active to change the control plan template to status Active. If the template revision is referred by any control plans, the Activate Control Plan Template Assistant window will open.
  2. In the Phase In Date field, you can enter any date in the future. If any existing control plans are phased out, the phase out date will be today's date.
  3. Depending on the type of the control plan template you will be guided through different steps.