This activity is used to display a cost performance graph of a DOP Structure.
Before this function can be performed, all the DOP costs need to be calculated.
Note: To get the most correct graph, the actual cost should be calculated every work day for the DOP structure. This can be done by starting a scheduled job that calculates the actual cost every day for a specific DOP structure or a specific site.
As a result of this activity, a cost performance graph is displayed.