Update Structure Revision and/or Alternative

Explanation

This activity is used to select a different revision and/or alternative of the structure for the production schedule line. The existing revision is selected automatically when a production schedule is created.

Prerequisites

This activity requires that the production schedule line is already created (manually or by planning logic). Its state could be either Firm or Non-Firm.

System Effects

As a result of this activity, planning logics like MRP will take the updated structure revision/or the alternate into consideration for the next calculation.

Window

Production Schedule by Line
Production Schedule by Line Part

Related Window Descriptions

Production Schedule by Line
Production Schedule by Line Part

Procedure

  1. Right-click and then click Update Revision. The Update Structure Revision and/or Alternative dialog box appears.
  2. In Update Structure Revision and/or Alternative dialog box, select the desired structure revision and an alternative combination in the Revision field. Click List to select from available valid combinations.
  3. To change only the alternative, select the specific alternative in the Alternative list.
  4. Click OK.