Net Branch
Explanation
Use this activity to perform netting processes for the selected order and all its lower
orders. It is also possible to perform re-netting when the quantity of the structure
is changed after the release; you can also re-net after canceling netting relations.
Netting is performed in the following sequence:
- Excess inventory (inventory with no netting relations within Dynamic Order
Processing DOP)
- Excess order with the same DOP
- Excess order with a different DOP
For
DOP orders, where the DOP header is connected to a project and where Create
Pegged is set to Pegged Orders, netting is allowed only from the
project inventory. If Create Pegged is set to No Pegged Orders,
netting is allowed only from the standard inventory.
For project connected DOP orders, netting is performed in the following
sequence:
- Netting will be performed from Project Inventory.
- Use any excess DOP orders within the same project. A DOP order can only be netted from other DOP orders with
revised due dates earlier or equal to it.
Prerequisites
- This activity requires that the DOP order has the netting parameter set to
Netting
in order to be netted.
- The DOP order header must at least have reached the Unreleased
state.
System Effects
As a result of this activity:
- The selected DOP order and its lower orders are netted.
- If serial numbers are reserved for a DOP order and the DOP order's demand is reduced due
to netting, the number of the corresponding serial number will be unreserved.
Window
DOP Header
Related Window Descriptions
DOP Header
DOP Header/Structure
Procedure
- Open the DOP Header window.
- Select the DOP header for the branch, to be used for netting, and then
click the
Structure tab.
- Right-click anywhere in the tab header and then click Net Branch.
- A message appears inquiring whether you want to net the branch DOP header.
Click Yes to confirm.