Create Top DOP Order
Explanation
This activity is used to create a top DOP order. No lower level DOP
structure will be created.
Prerequisites
The status of the DOP header should be Created.
System Effects
As a result of this activity:
- A top DOP order will be created in
the Unreleased state. If serial numbers are reserved for the DOP header, these are moved to
the top DOP order. The Structure Changed check box will be selected for the specific DOP order and
the DOP header.
- If the DOP header is project specific the top DOP Order
created will be tagged with Project ID and Activity Sequence.
- A valid routing revision and buildable routing
alternative records will be added for the top DOP order. If no buildable or plannable
routing alternative exist for the part a DOP log is created. If the routing is serial
effective and no serial numbers are reserved for the DOP order a DOP log is created.
- The revised due date and the revised start date are calculated
for the top DOP order, depending on revised due date of the whole DOP structure,
lead-time and lead-time offset, where the lead-time is depending on lot size and
routing revision and alternative.
Window
DOP Header
Related Window Descriptions
DOP Header
Procedure
- Open the DOP Header window.
- Select the DOP header for which you want to create the top DOP
order.
- Right-click on the header, point to Create DOP Structure and then
click Create Top Order.