Update Connected PM Actions

Explanation

This activity is used to update standard jobs on PM actions when the standard job is changed. To do so right-click on the relevant standard job in the Standard Jobs, Separate Standard Job or Route Standard Job windows and click Update Connected PM Actions. The right-mouse-button options will only be available for revision control disabled active standard job revisions.

It is possible to view a summary of the registered separate and route PM actions that have connections to updated standard jobs from PM Actions for Standard Jobs window.

Prerequisites

System Effects

Window

Separate Standard Job 
Route Standard Job

Related Window Descriptions

Separate Standard Job 
Route Standard Job 

Procedure

  1. Open either the Separate Standard Job or Route Standard Job windows and query for an active revision (F3).
  2. Right-click and then click Update Connected PM Actions (This option will be available only when an Revision control is disabled on standard job).