Replace Obsolete Standard Job Revisions 

Explanation

This activity is used to replace obsolete standard job revisions that are connected to PM actions. You can either replace the revisions individually or process it in batches.

It is possible to view a summary of the registered separate and route PM actions and work orders that have connections to obsolete standard jobs. To do so right-click on the relevant standard job in the Standard Jobs, Separate Standard Jobs or Route Standard Jobs windows and click Obsolete Revisions on PM Actions or Obsolete Revisions on Active Work Orders. The right-mouse-button options will only be available for active standard job revisions.

Prerequisites

System Effects

Window

Separate Standard Job 
Route Standard Job

Related Window Descriptions

Separate Standard Job 
Route Standard Job 

Procedure

  1. Open either the Separate Standard Job or Route Standard Job windows and query for an active revision (F3).
  2. Right-click and then click Replace Obsolete Revisions on PM Actions. (This option will be available only when an obsolete connection exists.)

To replace the revisions in batches:

  1. Open the Replace Obsolete Standard Jobs on PM Actions dialog box. Change the value in the Site field if required and click OK. Alternatively you can click Default display the default values defined by your administrator in Database Tasks.
  2. Optionally click Schedule and follow the steps in the wizard that appears if you wish to schedule the task as a background job run automatically at predefined intervals.