Use this activity to enter work order costs for the standard job.
Before the costs are entered for the standard job, the following must have been completed:
As a result of this activity, the costs are linked to the standard job. When the standard job is linked to to a PM action or a work order, all the costs entered here will be copied.
Use the following procedure to enter the information: