Connect Tools and Facilities to Separate Standard
Job
Explanation
Use this activity to connect tools
and facilities to a separate standard job. The tools and facilities connected
will be copied to the PM Action once the PM Action is generated.
Prerequisites
- Tools and Facilities must be defined and connected to sites in
Tools and Facilities
Basic Data.
- The standard job should not be connected to a PM
Action or work order.
- Operations must be defined if they are to be connected to the tool and
facility. The connection is mandatory if the standard job is to be connected
to a work order that is used for VIM serial objects.
System Effects
As a result of this activity tools and facilities will
be connected to the Separate Standard Job.
Window
Separate
Standard Job
Related Window Descriptions
Separate Standard Job
Separate
Standard Job/Tools and Facilities
Procedure
- Open the
Separate Standard Job window, create a new record
(F5) or query for an existing one (F3).
- Click the
Tools and Facilities tab and and create anew
record (F5).
- In the Tool/Facility Type
field, use the List of Values to enter a
tool or facility
type. It is also possible
to only enter a tool or facility ID. In this case use the List of Values in
the Tool/Facility ID field to enter a tool or facility ID.
- In the Quantity
field, specify if known the quantity of the tool or facility that will be used
for the standard job.
- In the Planned Hours
field, specify if known the number of planned hours.
- Save the information (F12).