Add Separate and Route Standard Jobs

Explanation

Use this activity to add separate and route standard jobs to the PM actions that are created for the object. Standard jobs can be connected using one of the following methods: 

Note: Standard jobs that are connected to the job program will automatically be displayed when a job program is retrieved to the window. 

Prerequisites

System Effects

Window

Add Job Program to Object

Related Window Descriptions

Add Job Program to Object 
Add Job Program to Object/Separate
 
Add Job Program to Object/Route
 
Add Standard Jobs by Category

Procedure

Connecting individual standard jobs:

  1. Open the Add Job Program to Object window and define the header details.
  2. Click the Separate tab to add separate standard jobs, or the Route tab to add route standard jobs.
  3. Click on the upper table and create a new record.
  4. Enter the standard job ID and revision in the relevant fields. Repeat steps 3 and 4 as often as required.
  5. Save the information (F12).

Connecting standard jobs based on categories:

  1. Open the Add Job Program to Object window and define the header details.
  2. Click the Separate tab to add separate standard jobs, or the Route tab to add route standard jobs.
  3. Right-click on the table and then click Add Std Jobs by Category. The Add Standard Jobs by Category dialog box opens.
  4. Enter values in one or more of the following fields: Object Category, Object Type, Type Designation, and Part No. Click List to select appropriate values.
  5. Click Search. The results will be displayed in the table below.
  6. From the available list, select the standard jobs you want to add by selecting the Select check box.
  7. Once the selection has been made, click Return.