Approve Fault Deferral

Explanation

This activity is used to approve a fault deferral. A fault deferral can only be activated once it has been approved. When a deferral is approved, the authorization is set and the calculation for the deferral date will take place.

Prerequisites

System Effects

As a result of this activity, the deferral will be approved and the task date is calculated. 

Window

Open Deferred Faults 

Related Window Descriptions

Open Deferred Faults
Serial Operational Information/Fault/Additional

Deferral Definition

Operations and Fault Basic Data/User Auth. Deferrals

Procedure

  1. Open the Open Deferred Faults window and query (F3) for the required fault number.
  2. The User Authorized? check box will be selected if you (the logged-on user) have the authority to approve the fault deferral.
  3. Select the row, right-click and then click Approve. The Approved check box will be selected automatically.