CAMRO Interim Order Structure/Tree Structure/Costs

CAMRO Interim Order/Costs

[About Interim Demand Structures] [About CAMRO Interim Order Structures] [About Costing Basic Data]

[To Execute Work Scope]

Usage

Use this tab to view the estimated or actual cost figures for the selected CAMRO interim order. This can be a single order viewed either within the context of an CAMRO interim order structure, in the case of CAMRO Interim Order Structure/Tree Structure/Costs, or standalone, as in CAMRO Interim Order/Costs. All CAMRO interim orders are part of an interim order structure. 

The user can calculate estimated costs for an individual interim order as long as the structure state is not Canceled. As repair interim orders are connected to the interim order structure, or as work scope changes occur, for example specifying a different maintenance level, the estimated costs will change.

Once the supply shop orders have been released and reporting on disassembly has occurred, the user can also calculate actual costs. The actual costs for the interim order are calculated using a conventional cost rollup for both disassembly and assembly structures based on the cost bucket definition in IFS/Costing.

Both the estimated and actual costs are shown by manufacturing level and accumulated by part. The variances between estimated and actual for level and accumulated cost are also shown. The costs are broken out by cost bucket, with a sum total at the bottom of the window. The summation provides an overview of the costs and variances for the selected interim order.

Activity Diagrams

Handle order structure

Activities

Evaluate MRO interim order costs