Update Result from Level 0

Explanation

Use this activity to update the forecast for level 0. The forecast for level 0 was automatically transferred to level 1 when the calculation of level 0 was performed.

Prerequisites

This activity requires that the calculation of level 0 must have been performed.

System Effects

As a result of this activity, the system automatically updates the value created from the calculation of level 0.

Window

Master Scheduling Level 1 Part

Related Window Descriptions

Master Scheduling Level 1 Part, Master Scheduling Level 1 Part/Register Forecast

Procedure

  1. From the Part No list box, select the part for which you want to update the forecast from level 0.
  2. Open the Register Forecast tab.
  3. Enter a new forecast in the Forecast 0 column.
  4. Save.