Start Production

Explanation

This activity is used to register that a production has started on one or several operations. It is possible to register both labor and machine time.

The start time and the stop time of a setup will be recorded. The clocking sequence is a unique number that will be set for each line that is started. Same clocking sequence will be set for all operations that are started at the same time.

From time clock, you can start production for only one operation at a time.

Prerequisites

System Effects

Window

Shop Floor Workbench
Time Clock

Related Window Descriptions

Shop Floor Workbench
Start Production
Time Clock

Procedure

  1. Open the Shop Floor Workbench window. If Reporting Mode has been set to Employee Reporting on the used site an employee or team must have been entered in the Enter As dialog box.
  2. Click Refresh. The operations will be displayed according to the filter that is being used.
  3. Select the operation lines for which you wish to start production, and click Start Production.
  4. The Start Production dialog box will be opened. Based on the data entered in the Shop Order window, Machine Time and Labor Time options will be selected. You can change the values if you want to.
  5. Choose the resource which on the operation will run in the Resource list.
  6. If run in Employee Reporting mode, enter the employees that will work with the operation in the Employee table. If run in Anonymous mode; enter the crew size manually. If a team is entered in Shop Floor Workbench, the employees currently in the team will be displayed and may not be changed.
  7. Click OK. The start time can be viewed in the Clockings tab.

 

To perform this activity from Time Clock

  1. Click the Start Production button in Time Clock.
  2. Enter the Employee ID or the Team.
  3. Enter the Operation ID you want to start production for.
  4. If machine run time exists for the operation, Machine Time will be automatically set to Yes. Set it to No if you do not want to start machine time.
  5. Choose the resource on which the operation will run in the Resource ID.
  6. If the existing clockings for the employee should be stopped, select Yes in Stop Emp Clockings. The default value is set based on the value of Allow Concurrent Operations for the employee in Manufacturing Labor Class/Employee tab.
  7. Click OK.