Schedule Shop Orders/Operations Automatically or Using Drag-and-Drop or Using Insert

Explanation

This activity is used to schedule or reschedule shop order operations, either automatically or using drag-and-drop or insert of operations. This activity can be used to move individual shop order operations or entire order structure at a time.

Prerequisites

System Effects

N/A

Window

Advanced Planning Board
Simulation Client

Related Window Descriptions

Advanced Planning Board
Simulation Client
Scheduling Client

Procedure

Automatic scheduling:

  1. On the Activities tab, select the shop order for which you want to perform this activity.
  2. Drag the order into the object table area of the Gantt chart while pressing the Shift key. It will be placed in the object table area with its operations already expanded.
  3. Select the shop order, right-click and then click Scheduling. This will open the Change Schedule window.
  4. Select the required scheduling options from the Scheduling Action(s), Schedule Mode and Resource Assignments areas.
  5. Click OK. The order will be scheduled according to the options selected in step 4. You can see this in the Gantt chart.

Rescheduling operations/DOP structures using drag-and-drop or insert:

  1. On the Activities tab, select the shop order for which you want to perform this activity.
  2. Drag the order into the object table area of the Gantt chart while pressing the Shift key. It will be placed in the object table area with its operations already expanded.
  3. Expand the operation up to the assigned resource level.
  4. Then place the curser on the required operation on the resource and click.
  5. Then move the cursor while clicking to a different time slot on the resource.
    Note: The cursor will turn into a small downward triangle with the letters INS on it..
  6. The operation will be inserted to the time slot on the resource by rescheduling the already assigned operations if there are any.