Define a Component for Direct Salvage

Explanation

Use this activity to directly salvage a component that is present in the actual structure received for repairing but is not listed in the as-built structure.

Prerequisites

Multilevel repair shop order should exist with the parent part in Reserved or Issued state.

System Effects

As a result of this activity, the component defined for direct salvage is listed in the Shop Order/Salvage Parts tab and the user can receive it to the inventory as a salvage part.

Window

Shop Order

Related Window Descriptions

Component Replacement Details

Procedure

  1. Open the Shop Order window and query for your multilevel repair shop order.
  2. Make sure that the state of the parent material line is Reserved or Issued.
  3. Open the Multilevel Repair Structure tab.
  4. Select the top part from the graphical tree structure, right-click and then click Expand Descendents.
  5. Select the revision node of the parent part, from which you want to create a salvage part directly.
  6. Right-click and then click Component Replacement to open the Component Replacement Details dialog box with the parent part you selected in the header as the parent part.
  7. Click Add to create a new record in the table. Select Salvage from Repair Action field.
  8. In the Replace Part No field, enter the part number you want to add. Here you can get the List of Values.
  9. Enter the actual values you found with the part to be salvaged in Serial No, Lot/Batch No, W/D/R/No, Revision No, in replacement part parameter fields.
  10. Enter the component quantity in the Replace Quantity field.
  11. Enter the repair reason for the structure changes. Here you can get the List of Values.
  12. Click Apply or OK.