This activity is used to stop a material requisition. When this is done, the requisition will no longer be handled as a demand in IFS Applications and the order will be stopped. Reservation of lines is not allowed.
A material requisition header must have been entered and saved.
The material requisition will be stopped, and will not be handled as a demand.