Move Node

Explanation

This activity is used to disconnect a node with reporting entity connections from the node above it, and then connect it to another node via a single structure operation. The node will be moved together with connected reporting entities and sub nodes.

Prerequisites

In order to perform this activity, the status of the consolidation structure should be In Progress.

System Effects

As a result of this activity:

Window

Consolidation Structure

Related Window Descriptions

Consolidation Structure
Move Node

Procedure

To move a node:

  1. Open the Consolidation Structure window and search for the consolidation structure in which the node to be moved exists.
  2. Right-click on the node to be moved and click Move Node to open the Move Node dialog box.
  3. In the Node field in the Move To group box, enter the new node to which the node being moved should belong. The List of Values can be used to select the required node.
  4. In the Ownership field, enter the ownership percentage for the new connection.
  5. Select a value for the Consolidation Method field.
  6. In the Event Date field, enter the date from which the effect of node connections resulting from the move should be valid.
  7. Modify the value displayed in the Period field if required. (Note: The period is automatically displayed when you enter a date in the Event Date field.)
  8. Enter a description in the Comment field if required.
  9. Double click on the Notes check box, if you want to enter notes.
  10. Click OK.