Use this activity to evaluate estimated and actual costs associated with the complete interim order structure. You can evaluate level and accumulated costs cumulatively up to the top level in the order structure. For both disassembly and assembly structures the accumulated costs are calculated in the conventional cost rollup manner.
Users should have executed the Calculate Costs activity in the interim order structure header.