Engineering Part Revisions

Engineering part revision is the cornerstone of the PDM Configuration module. For each engineering part, you may have one or several revisions. Each revision has a set of properties which must be configured according to your requirements. The general properties are given below:

A spare part list. Any engineering part revision can have a spare part list. Spare part lists can be copied to project items in Project Delivery and, further, to Maintenance.

When creating a new engineering part revision, the part gets a default status called preliminary. When you are finished developing the part, the part is set to released status. An engineering part which is not needed should be set to obsolete. This means that the part cannot be used any further. Each obsolete revision with all its data is available for tracing and analyzing as long as the revision is not deleted.

An engineering part revision has a lifecycle described by a state machine. The figure below describes the possible status values:

wpe7.jpg (15777 bytes)