CRO Interim Order/Component

[About Interim Demand Structures] [About Part Ownership] [About Condition Codes]

Usage

Use this tab to view the components required for this interim order. The significance of these components depends on the type of interim order. For a disposition interim order, the components are the part to be inspected, plus any material needed to perform the inspection (as defined in the disposition structure). For a repair interim order, the components represent the part to be repaired, plus any spare or repair parts needed to perform the repair (as defined in the repair structure).

Activity Diagrams

N/A

Activities

N/A