Connect Material
to a Work Order
Explanation
This activity is used to plan material lines that are required to perform the work
order. You can also adjust the planned material requirement at any time during
planning or when performing a work order. For each part, you can see how many
have already been issued, and how many are available in inventory. You can also
view information about each part from the inventory register in IFS/Inventory.
All of these alternatives are available through several right mouse button
options. If a work order is PM-generated, the entire material planning is copied
from the PM-action to the work order. If a work order is
generated from a maintenance order (in IFS/Vehicle Information Management), all
the maintenance order material demands will be transferred to the work order.
If rental tools are entered on the
Tools and Facilities tab, then
corresponding material line will be created automatically for inventory-tracked
rental tools. The Rental check box will be selected for rental material lines.
When a Work Order is created from a CRO line, a new
maintenance material requisition will be created. The component to be repaired
will be included as a part with the Repair Part check box selected.
You can connect materials to any site that belongs to the same company as the
work order (provided the user is connected to the site).
Prerequisites
- The inventory part must exist in IFS/Inventory.
- If the material is to be
connected to a job, the jobs must have been defined on the
Jobs tab
prior to connecting the material to the work order.
System Effects
- The inventory part is linked to the work order.
- If demands have already being created in IFS
Distribution for the maintenance order material, the demand type will change from
Maintenance Order to Work Order. (Demand lines can be viewed in
the Inventory Part Availability Planning window.)
Window
Prepare
Work Order
Prepare Work Order Quotation
Work Order Execution
Logic
Related Window Descriptions
Prepare Work Order
Prepare Work
Order/Materials
Prepare Work Order Quotation
Prepare Work Order Quotation/Prepare
Prepare Work
Order Quotation/Prepare/Materials
Work Order Execution Logic
Work Order Execution Logic/Materials
Procedure
- Open the
Prepare Work Order window or the
Prepare Work
Order Quotation window.
- Click the
Material
tab (for work order quotations this tab
is found under
Prepare Work Order Quotation/Prepare), and create a
new record.
- The site of the work order is displayed in the Site field by
default. Use the List of Values to enter a different site the user is
connected to.
- Enter the signature of the person creating the
material line in the Signature field and the internal destination in
the Int Destination field. Use the list of Values to select a
suitable value.
- Enter the due date for the material requisition.
- Save the
record (F12).
- On the table below, create a new record (F5).
- Enter an appropriate part in the Part No
field. Use the List of Values to select a suitable value.
- Enter the condition code if applicable. Use the List
of Values to select a suitable value.
- Enter a value in the Job ID field if you want
to organize the material lines according to jobs. Use the List of Values to
select a suitable value.
- Enter a value in the Operations field if you
want to connect the material line to a particular operation. Use the List of
Values to select a suitable value.
- Enter the date on which the material is needed in the Date
Required field, and the quantity required in the Quantity Required
field.
- Enter the sales part site and the sales part number if
you want to invoice the price of the material to a customer. Enter a
discount if applicable (only applicable to IFS/Service Management).
- Specify the supply code as to from where the
material is supplied.
- Save the information (F12).
When connecting materials for Report In Route, following additional
step has to be taken.
- Enter a value in the Route Sequence Number field. Use the List of
Values to select a suitable value. This indicates which route action and the
route PM action requires the materials. This value will be fetched
automatically if the material line is connected to the route PM action.
If the part entered has the Create Repair WO
check box selected
- Enter or modify the values in the Object Site for Repair WO, Object ID for Repair WO,
Directive
for Repair WO, Maint Org Site for Repair WO and Maint Org for
Repair WO fields.
- Optionally, enter or modify the value in the
Lot/Batch No for Repair WO field.
- Optionally, select the Copy Prepostings to Repair WO check box.
Note: You can also connect materials to a work
order in Work Order Execution Logic/Materials.