Use this window to create a post maintenance check definition. There can be several revisions defined for a post maintenance check, but only one revision can be active at a point in time.
To be able to activate and use a post maintenance check definition you need to assign parts and revisions and specify valid intervals. In addition, you can connect instructions (operations) to the definition, setup the order in which instructions are to be performed, define material or tool-and-facility requirements, and enter sign off requirements.
Post maintenance check definitions can be connected to faults and modifications reported against the part revision on the definition. When the fault is signed off or the modification complied with, post maintenance check tasks will be generated for the relevant serials based on the given intervals. The generated tasks will automatically receive the operations, subtasks, materials, tools-and-facilities, sequencing and sign off requirements that are defined on the post maintenance check definition.
Documents can be connected to the post maintenance check definition by using the Attachments panel. When a post maintenance check definition is deleted, the connection to the document will be removed. If there is a need to delete the document itself, this must be done manually using IFS/Document Management.
For the description of each tab in the window, follow the appropriate link: General, Intervals for Parts, Assign Part Revisions, Instructions, Journal, All PMCs.
Define Post Maintenance Check Definitions
Create
Post Maintenance Check Definition
Create New Revision of Post Maintenance Check Definition
Copy Post Maintenance
Check Definition
Set Post
Maintenance Check Definition Active
Set Post
Maintenance Check Definition Obsolete