Use this dialog box to enter the initial structure change date for a serial installed in a structure, when the operational status is changed to In Operation or Out of Operation the first time. An entry will be created in the replacement history to indicate the first time the serial was installed in a structure. You need to provide a structure change date for the transaction in the replacement history. Structure changes carried out at a later date cannot have a structure change date that is earlier than the first structure change date.
Define
Serial Structure
Maintain
Serial Structure
Enter Historical Life Data for Used Serials
Complete
Maintenance Task
Set
Serial Structure In Operation
Set Serial Structure Out of Operation