Set Serial In Operation
Set Serial Out of Operation

[About Serial Structures] [About VIM Access Control] [To Perform Maintenance Engineering] [To Manage Serialized Configuration] [To Manage Line Maintenance] [To Dispatch Asset and Close Maintenance Visit]

Usage

Use this dialog box to enter the initial structure change date for a serial installed in a structure, when the operational status is changed to In Operation or Out of Operation the first time. An entry will be created in the replacement history to indicate the first time the serial was installed in a structure. You need to provide a structure change date for the transaction in the replacement history. Structure changes carried out at a later date cannot have a structure change date that is earlier than the first structure change date.

Activity Diagrams

Define Serial Structure
Maintain Serial Structure
Enter Historical Life Data for Used Serials
Complete Maintenance Task

Activities

Set Serial Structure In Operation
Set Serial Structure Out of Operation