Use this tab to set the intervals that determine when the terminating action is performed for this modification. The terminating action is the actual modification of the serial or serial structure. Once the terminating action is performed on a serial, the modification is complied with or embodied.
The description of what should be done and how it should be done is handled by connecting instructions in the Instruction tab. If you are using IFS/Complex MRO, the description of the work to be done is defined using repair codes in IFS Manufacturing.
Note: Data may not be entered in this tab if the check box Next Visit In Workshop is selected or if a maintenance code is entered in the Next Interval Maintenance field in the Define Modification/Assign Parts tab.