Create PM Actions for Objects in Service Line
Explanation
Use this activity to create separate PM actions for objects in a structure that a service line is applicable to.
You can use an existing PM action or a separate standard job to serve as the
template when creating the PM actions.
Prerequisites
- Service lines should exist in Service
Contract/Services.
- Actions and maintenance organizations should be
entered in IFS/Basic Data for Maintenance. Ideally a work time calendar
should be connected to the maintenance organization.
- If you need to create PM actions using existing PM action, separate PM
action should be created in IFS/Preventive Maintenance.
- If you need to create PM actions using standard job, separate standard
jobs should be created in IFS/Preventive Maintenance.
- If you need to create PM actions at PM Settings tab, at
least one separate PM action should be created to an object in service lines
using Service
Contract/PM Settings.
System Effects
Identical separate PM Actions will be created per service line, for objects
in a structure.
Window
Service Contract
Related Window Descriptions
Service Contract
Service Contract/PM Settings
Service Contract/Services
Create PM Actions
Procedure
- Open the Service Contract window and
query for an active service contract (F3).
- Click the PM Settings tab and
select an existing PM action line that is created for a service line.
Alternatively, click the Services tab, select the service line
which you want to create PM actions for.
- Right-click and select Create PM Actions. Note:
- If on PM Settings tab, in appearing Create PM
Actions for Objects in Service Line dialog box, create from PM
Action check box is selected. Also, the values for Line No, PM
No and PM Revision are fetched from the PM action line.
- If on Services tab, in appearing Create PM Actions
for Objects in Service Line dialog box, Line No is fetched
from the service line.
- If you want to create the PM actions using an existing,
- If on PM Settings tab, keep the already selected PM no or
change it as required using List of Values.
- If on Services tab, select PM Action check box and
enter values in PM No and PM Revision.
- If you want to create PM actions using a standard job, select create
from Standard Job check box and enter values to Standard Job ID,
Action and Maint Org using List of Values. Select Create
for Objects that match the Categories in Standard Job if you want to
create PM actions only for the objects that fall under the categories
mentioned in the selected standard job.
- Define the object or structure that the PM actions should be created, by
entering values in Connection Type, Object Site, Object ID
and Selection Criteria using drop down lists and List of Values.
- Select OK to create the PM actions for selected objects.