Risk Cost Exposure Tracking/Exposure per Revision

[About Risk Management] [About Risk Analysis] [To Risk Management

Usage

Use this tab to track the history of the total risk cost exposure for a particular risk analysis when a revision has been created.

While information cannot be modified it is displayed in both the tabular and graphical views, when the left pane of this window is populated or queried for a particular risk analysis.

The total cost exposure, based on the cost exposure from all risk consequences which do not have the Resolved status, is displayed for each revision of the risk analysis. The trend should be to reduce risk cost exposure.

For the description of each tab in the window, follow the appropriate link: Graph, Details.

Activity Diagrams

Mitigate and Review Risk
Analyze Risk Analysis History

Activities

Confirm Risk Analysis
Analyze Cost Exposure Tracking Information