Create Integration Configuration for Basic Data

Explanation

This activity is used to create an integration configuration record for the basic data integration between IFS Applications and the  Primavera Project Management module (Primavera).

Basic data in IFS/Project are calendars and resources. In order to be able to export or import projects with basic data to/from Primavera it is necessary to have the basic data already existing on the receiving side. This can be done by exporting or importing the basic data separately, or by entering the basic data manually. Note that while resources can both be exported and imported, calendars can only be exported. The integration of data between IFS/Project and Primavera is described in detail in About Integration to Primavera Project Management.

Integration configurations for basic data are created and saved as records in the Integration Configuration/Basic Data Integration tab, and can therefore be reused any number of times. A record can be selected to perform a basic data analysis, or to initiate a basic data export or import.

Prerequisites

System Effects

Window

Integration Configuration

Related Window Descriptions

Integration Configuration/Basic Data Integration

Procedure

  1. Open the Integration Configuration window and click on the Basic Data Integration tab.
  2. Create a new integration configuration record.
  3. Enter a value in the Integration ID field.
  4. Select Export or Import in the Direction field.
  1. Optionally you can do one or more of the following:
  1. Select a valid value in the Setup ID field which is the identity of the setup used to access Primavera.
  2. Select a value in the Owner ID field.
  3. Optionally, enter a note.
  4. Save the record.