CAMRO Interim Order Structure/Tree Structure/Assembly

[About Interim Demand Structures] [About CAMRO Interim Order Structures]

[To Execute Work Scope

Usage

Use this tab and the associated sub-tabs to view the structure and details of the existing interim orders for an interim demand header. For the selected node (i.e. the interim order) in the graphical structure, the sub-tabs display information about components, associated supply shop orders, repair orders that are generated during disposition and both estimated and actual costs.

You can see the details of the interim orders for the position parts exposed for maintenance, as well as the multi-level structural relationships of these orders. The graphical structure can be used to see the relationships between repair and assembly interim orders. Each node in the structure represents an interim order.

You can select a repair interim order node, right-click and then click Disconnect From Parent to disconnect repair interim orders from the structure. This may be done because the supply date from the repair will be too late to feed the start date of the subsequent assembly interim order to which it is linked. This action can impact both the schedule and costs associated with the interim order structure.

Whenever you perform an action in the CAMRO Interim Order Structure window header or in one of the sub-tabs, you will need to refresh the window to see the resulting changes in the graphical structure.

Note: You can resize the window by dragging the splitter bar to the left or right.

Activity Diagrams

Handle order structure

Activities

N/A