CAMRO Interim Order Structure/Tree Structure

[About Interim Demand Structures] [About CAMRO Interim Order Structures]

[To Execute Work Scope]

Usage

Use this tab and its sub-tabs to view the structure and details of the existing interim orders for an interim demand header. For the selected node (i.e., interim order) in the graphical structure, the sub-tabs contain information about components, associated supply shop orders, repair orders that are generated during disposition and both estimated and actual costs.

In this window the user can propagate changes to the start and required dates on the top-level disassembly or assembly interim orders made in the CAMRO Interim Order Structure/Tree Structure/Detail tab. This allows the user to see the effect on the start and supply dates for the remaining downstream or upstream orders in the order structure. (Downstream indicates a direction from higher level disassembly to lower level disassembly or from disassembly to disposition, while upstream indicates a direction from lower level assembly to higher level assembly or from repair to assembly.)

For a description of the contents and function of each sub-tab, follow the appropriate link: Disassembly, Assembly, Detail, Components, Operations, Supply Orders, Assignments, Repair Orders, Costs.

Activity Diagrams

Handle order structure

Activities

Release
Release structure
Cancel
Disconnect from parent
Propagate dates downstream
Propagate dates upstream
CAMRO interim order