Evaluate RRP Results

Explanation

Use this activity to study the results of resource planning. For each work center resource, the capacity and workload of the period are shown. You also can study the type of workload that burdens the resource at different periods of time.

Prerequisites

This activity requires that the calculation of RRP must have been performed.

System Effects

There are no system effects as a result of performing this activity.

Window

RRP Load per Work Centers

Related Window Descriptions

RRP Load per Work Centers

Procedure

Use either the Populate or Query function to retrieve the work center for which you want to study the work load.