Stop Production
Explanation
This activity is used to stop a started production on one or several
operations.
When calculating operation hours, the priority of calculating the operation
hours should be as follows:
- Based on the calendar settings defined in the Manufacturing Labor
Class/Employees tab.
- If calendar is not defined, when IFS/Human Resources is installed, refer
the employee's work schedules defined in the Employee Schedules and
Rules window.
- If employee’s schedule is day type independent or
If IFS/Human Resources is not installed, and no valid schedule exists for
the employee;
then use the labor class calendar defined in the Basic Data for
Manufacturing Labor window.
This activity contains a Security Checkpoint which can be activated by an
administrator. With an activated security checkpoint on a function you will have
to authenticate yourself again in order to fulfill the function. Additionally,
whenever a security checkpoint is successfully passed a security checkpoint log
is written, creating an audit trail of what is done.
Prerequisites
The production (runtime) must have started on the operation.
System Effects
- The started production will be stopped for the selected operation and
all operations with the same clocking sequence.
- The stop time will be recorded on the clockings. The clockings can be
viewed in the Clockings tab.
- The cogwheel symbol the operation had during the production will be now
removed.
- The started production will be stopped. The
selected operation and all operations with the same clocking sequence will
be stopped.
- If Stop Reason is set to Interrupted an exclamation mark
will appear to the left in the operation list.
- The status of the operation is set to either Partially Reported
or Interrupted depending on the selected Stop Reason.
- Transactions are created in operations history:
The total time is calculated and one transaction per clocking and operation
is created in operation history.
Time is calculated as: Stop time – Start time; calendar consideration
For Machine Time the work center calendar is used
For Labor Time the labor class calendar is used. If the employee has
a calendar connected this will override the labor class calendar for the
labor time.
Depending on the site settings either all time, only calendar time or
calendar and overtime is included.
In Anonymous Reporting mode, the crew size defined in the start
dialog will be saved on the labor transaction and used in the cost
calculation.
In Employee Reporting mode, one transaction per employee is created and the
crew size is calculated with regards to other overlapping clockings for the
employee.
The total time on the operations started at the same time (with the same
clocking sequence) will be proportionally divided among the operations
according to the planned time defined on the shop order operation line.
Example: three operations have 10, 15, and 22 planned minutes (planned total
of 47 minutes), and in total 62 actual minutes are reported.
10/47x62=13,1915
15/47x62=19,7872
22/47x62=29,0213
13,1915 + 19,7872 + 29,0213 = 62
Window
Shop Floor Workbench
Time Clock
Related Window Descriptions
Shop Floor Workbench
Stop Production
Time Clock
Procedure
- In the Shop Floor Workbench window, select
the operation line and click Stop Production.
- The Stop Production dialog box will open.
- Select an appropriate option in the Stop Reason list.
- Click OK. The finish time can be viewed in the Clockings
tab.
To perform this activity from Time Clock
- Click the Stop Production button in Time
Clock.
- Enter the Employee ID or the Team.
- Operation IDs with ongoing clocking for operation
run by the employee
or the team will be listed, select the operation ID you want to stop
production
for.
- If you want to stop the machine clocking
also, select Yes in Machine Time.
- If you want to report an interruption, select an
interruption cause. Otherwise leave the field empty.
- If you want to close the operation select Yes
in Close Operation.
- Click Ok.