Enter Split Reason Code

Explanation

Use this activity to create a split reason code and it is necessary to have a pre-defined reason code to be attached when the shop order is split.

Prerequisites

N/A

System Effects

The system attaches a reason code to each split shop order.

Window

Split Basic Data
Shop Order

Related Window Descriptions

Split Basic Data
Shop Order

Procedure

Basic Data Procedure

  1. Select the Split Reason Code tab of the Split Basic Data window.
  2. Create a new record.
  3. Enter the Split Reason as a code with a maximum of ten characters.
  4. Enter the split reason description at Split Reason Desc which can be filled upto thirty five characters. The split reason note to be filled at the Note field is not required but can have up to two hundred characters.
  5. In the Split Reason Type field, choose Scrap, Rework, Engineering, Material, or Expediting.
  6. The Disabled check box is optional to select and it excludes the split reason from the list of selectable motives to why split is required.  
  7. Click Save.