Add Work Guideline to Shop Order, MRO Shop Order, Interim Order, CAMRO
Interim Order or CRO Interim Order
Explanation
This activity is used to connect work guidelines to components or operations in a shop
order, MRO shop order, interim order, MRO interim order or CRO Interim Order. You can create work guidelines manually or by using a work guideline
template in
Shop Order and
MRO Shop Order. In
Interim
Order,
CAMRO Interim Order or
CRO Interim Order you can only create new
guidelines manually.
Note: There are three types of guidelines: Instruction, Reference and
Sub Task. Work guidelines associated with structures can select only
Instruction or Reference as the guideline type. Work guidelines
associated with operations and routing can select only Inspection or
Sub Task as the guideline type.
If the guideline type is Sub Task, it is possible to indicate if they
need to be signed off by a floor worker and/or an inspector.
Prerequisites
A work guideline template must be defined.
System Effects
As a result of this activity, the system connects work guidelines to components or to
operations in a shop order, MRO shop order, interim order, MRO interim order or
CRO Interim Order.
Window
Shop Order
Shop Order Operations
MRO Shop Order
Interim Order
CAMRO Interim Order
CRO Interim
Order
Related Window Descriptions
Shop Material Allocation Work Guidelines
Shop Order Operation Work Guidelines
Shop Order/Operation
Shop Order
Operations
Select Work Guideline Template
CRO Interim Order
Procedure
In the
Shop Order, Shop
Order Operations and
MRO Shop Order windows,
follow these steps:
- Select the material line or operation to be connected to work guidelines.
- Right-click and then click Work Guidelines.
- Click New to add a work guideline.
- To create a work guideline manually, type information in the Guideline Desc and
Guideline Text fields.
- To use an existing work guideline template, mark the new line,
right-click and then click Work
Guideline Template. Select a work guideline template and then
click OK.
- Repeat steps 3-5 for each work guideline to be connected to the specific component or
operation.
- Click OK.
- Select Required in the Sign Off Required field to prevent
the operation from closing before the subtask has been signed off. Select
Required in the Inspection Sign Off Required field to prevent the
shop order from closing before the subtask has been signed off.
In the
Interim Order,
CAMRO Interim Order
and
CRO Interim Order
windows, follow these steps:
- Select the order having the components or operations you want to connect to work
guidelines.
- In either the
Component Work Guide or the
Operation
Work Guide tab, create a new line to add a component or
operation work guideline.
- Use the List of Values in the Line Item No field in the
Component Work
Guide tab or in the Operation No field in the
Operation Work Guide
tab
to select the component line or operation number to which to attach the work
guidelines.
- Enter a guideline sequence number. This is used to determine the order
in which the guidelines should be applied.
- For component work guidelines, select a value in the Guideline Type
field.
Valid values are Instruction and Reference. If you choose Reference,
you must enter values for the X coordinate, Y coordinate, Z
coordinate and reference quantity.
- Enter a guideline description and guideline text.
- Save your changes.