Calculate Cumulative Lead Time
Explanation
Use this activity to calculate a parts cumulative
lead time. The cumulative lead time of a part is the total turnaround time for all parts
in the structure. You can calculate the cumulative lead time for a single part,
or all parts for the specified site.
Prerequisites
A part must have been defined with a routing.
System Effects
As a result of this activity:
- The system calculates the
cumulative lead time for a part or parts on a site,
- The system updates the cumulative lead time
field in the Inventory Part/Manufacturing tab.
Window
Cumulative Lead Time
Calculation
Related Window Descriptions
Cumulative Lead Time Calculation
Procedure
You can either calculate the lead time directly (Procedure A), or schedule the task as a background job (Procedure B).
Procedure A:
- Open the Cumulative Lead Time Calculation dialog box.
- In the Site field, select the site for which you want to run the calculation.
Click List to select from the available sites.
- If you want to calculate the cumulative lead time for a specific part, select the part
in the Part No field. Click List to select from the available parts. If no
part is selected, the calculation is done for all parts in the site.
- Click OK.
Procedure B:
- On the Cumulative Lead Time Calculation dialog box, click Schedule. The
Create New Task Schedule window opens.
- Set the relevant scheduling parameters and Save. You can view the
scheduled tasks in the Scheduled Database Tasks window.