Attach Maintenance Levels to Structure

Explanation

Use this activity to: 

The maintenance level structure represents the set of all possible components and alternates that could be used to dis-assemble or assemble a part. For an attached maintenance level, some of the possible set of components may not be relevant.

Prerequisites

This activity has the following prerequisites: 

System Effects

As a result of this activity:

Window

Maintenance Level Structure

Related Window Descriptions

Maintenance Level Structure

Procedure

  1. Query the part, site, routing revision, routing type combination which identifies the maintenance structure to which you wish to attach maintenance levels.
  2. Left-click in the Maintenance Level field.
  3. Click New (F5). Enter the maintenance level you wish to associate with the maintenance level routing or click List of Values to select a maintenance level. If you enter a value for maintenance level, you must select a maintenance level that has been associated with the part.
  4. Click Save (F12). The set of all possible structure components will be loaded into the table window.
  5. Click the check box in the Included column to associate that component with the selected maintenance level.
  6.  Click Save (F12).