Evaluate CAMRO Interim Order Costs

Explanation

Use this activity to examine the cost information for an MRO interim order. You can view information such as the estimated as well as the actual level and accumulated costs. Level costs refer to the cost specific to the interim order selected, whereas accumulated costs refer to the costs accumulated through all the interim orders up to the level of the interim order selected. Currently accumulated costs for disassembly structures are also accumulated bottom up.

Prerequisites

N/A

System Effects

N/A

Window

CAMRO Interim Order Structure

Related Window Descriptions

CAMRO Interim Order Structure

Procedure

  1. From the Interim Header ID list, select the interim order structure that contains the interim order with the costs you want to evaluate.
  2. Open the Tree Structure tab.
  3. Click the Disassembly or Assembly tab, as appropriate.
  4. Click the Costs tab to examine the details relating to the level and accumulated costs incurred for the interim order.