Create Schedules

Explanation

Use this activity to define the schedules used for a day type, which is then connected to a specific period of time when creating a calendar. You can also create schedules in the Schedules window, although the day numbers must be defined in the Schedule window. Schedules cannot be overlapping. This mandatory task is to be performed by a system administrator or equivalent person. 

Prerequisites

This activity has the following prerequisites:

System Effects

As a result of this activity:

Window

Schedule, Schedules

Related Window Descriptions

Schedule, Overview Schedule

Procedure

To perform this activity, follow these steps:

  1. Open the Schedule or Schedules window.
  2. Create a new record.
  3. Enter a name and description for the schedule.
  4. Change the value in the Period Length field if necessary.
  5. In the Period Start Day list, click the starting day for the schedule.
  6. Save the changes.
  7. To define day types for each day, click in the Day Type field (in the Schedule window) for the first day number, and then select the day type from the List of Values.
  8. Repeat step 7 for each day number.
  9. Save the changes.