Calculate Cost for All Parts

Explanation

This activity can be used to calculate a cost set for all parts directly or to schedule cost calculation.

The activity can be used to calculate cost for a cost set for all parts or a group of parts where the selection can be done for part cost group, product family, product code, part status or a combination of those.

The calculation of all parts is performed as a batch job. The calculation updates the part's level labor costs and the cumulative costs in the estimate section of the inventory part register. The structures and operations of the part are calculated and the costs are rolled up to update the cumulative calculations of the parent part.

This activity can also be used to schedule automatic cost calculations for a cost set.

Note: You cannot perform cost calculation for cost set 1.

Prerequisites

This activity has the following prerequisites:

System Effects

As a result of this activity:

Window

All Parts Cost Calculation

Related Window Descriptions

All Parts Cost Calculation

Procedure

To calculate cost for part cost group follow the procedure A and B

Procedure A:

  1. Open the All Parts Cost Calculation window.
  2. In the Site field, click List and select the site for which you want to perform the cost calculation, from the List of Values
  3. In the Cost Set field, click List and select the cost set for which you want to perform the cost calculation, from the List of Values.
  4. In the Part Cost Group field, click List and select the part cost group for which you want to perform the cost calculation, from the List of Values.
  5. In the Effective Date field, specify the date where the structures and routings should be valid.
  6. In the Stop Roll field, select either Not Stop Cost Rollup or Stop Cost Rollup.
  7. Click OK.

Procedure B:

Click Schedule, it will open New Database Task Schedule window. Set the scheduling parameters as desired and save.