Assign Part Cost Group to Part
Explanation
Use this activity to assign a part cost group to a part.
Prerequisites
The part cost group must have been created.
System Effects
As a result of this activity, the system connects a part to a part cost group. Any change made to the part cost group affects
the connected part.
Window
Part Cost Group
Inventory Part
Related Window Descriptions
Part Cost Group
Part Cost Group/Group Contents
Inventory Part
Inventory Part/Misc Part Info
Procedure
From
Part Cost Group:
- Select the part cost group you are assigning to a part in the Part Group ID list box.
- Click the
Group Contents tab and create a new record.
- In the Part No column, specify the part you are assigning to the part cost group. Use List of Values to select from available parts.
- Repeat steps 3-4 for every part you want to assign to the group.
- Click Save.
From
Inventory Part:
- Select the part you are assigning to a part cost group, in the Inventory Part
list box.
- Click the
Misc Part Info tab.
- In the Part Cost Group field, specify the part cost group you are connecting to the part. Use List of Values to select from available groups.
- Click Save.