Add Contract Change Order Approval
Explanation
This activity is used to add an approval to the contract change order (CCO). A
contract change order may need an approval process to proceed during several
stages.
Example: Before the impact of a contract
change order is analyzed, the contract manager or change manager may be required
to approve that the scope of the change is within the policy of the company, or
approval maybe required before the CCO information is submitted to an external
party. The same approval routing can be used in several stages of the CCO, and
therefore can be initially defined at the time the CCO is created. It will be
triggered during the relevant status change in the CCO.
Prerequisites
- A contract change order should exist.
- Approval lines should be predefined in the
Contract Change Basic Data/Change Type/Approval per Status
tab if you need to have them as default values in the
Contract Change Order/Approvals tab.
- IFS Document Management should be installed if
you want to use the Attachments to add lines for an approval routing.
System Effects
- An approval is added to the contract change order.
Window
Contract Change Order
Related Window Descriptions
Contract Change Order
Contract Change Order/Approvals
Procedure
- Open the Contract Change Order
window and query (F3) for the required contract change order.
- Click the Approvals tab and, if the
necessary approval per status lines have not been retrieved from the change
type, create a new record (F5).
- Enter an Approval ID, Approval
Description and Change Approval Status for the status you require approval.
- Select the Use Approval Rule check box if you want
the system to check for approval rules that need to be retrieved for the approval lines.
Note: The
system will check for the approval rules if you right click on the approval
per status line and then click Fetch Approval Routing or click Approve.
- Select the Use Automatic Approval if you
want the system to automatically set this approval line to approved when all
approval lines in the approval routing has been approved.
- Save the information (F12).
- Repeat these steps for each approval per status
that needs to be created.