Enter Emergency Service Types
Explanation
This activity is used to enter the building blocks of the
emergency service schedulesthe emergency service type. The types are used in
both the emergency service cycle schedule and in the substitute emergency
service schedule.
The type describes the wage code for each time interval with
a different rate of compensation. You need to specify each time interval that is
differently compensated. You also need types to cover each day that is
compensated differently from any other day.
Prerequisites
Before you register emergency service schedule types, the following must have been completed:
- The wage codes you need to describe the various compensations for
emergency service duty.
System Effects
As a result of this activity, you can define emergency service cycle schedules
and substitute schedules.
Window
Emergency Schedule
Related Window Descriptions
Emergency Type
Procedure
- Enter the name and description of the emergency service type.
- Enter the start time and end time for the intervals in the From Time and
To Time fields.
In the From Day and To Day lists, specify whether the times
refer to
the current,
previous, or next day compared to the account date. The Sum field displays the number of hours which the interval
covers.
- In the Wage Code field, select the wage code for the relevant interval, using the List
of Values. The wage code name appears automatically.
- In the Validity field,
select the Emergency Gross option if the
compensation is independent of whether the employee clocks-in the current day. Select the
Emergency Net value if the actual presence should be
considered in the calculation of the compensation.
- In the Value Type list, select from among the predefined values.
- In the Value field, the value involved with the Fixed or Maximum value types is
entered.
- If appropriate, in the Value Threshold field, enter a value which must be reached before the increment
is given. The threshold is based on time, which falls within the specified relevance.
- If appropriate, in the Factor field, specify the multiplication factor. The
number of hours allocated by the calculation is
multiplied by the specified factor. Although the default factor is 1, this
value can be changed.